Use and maintenance:
1 when you first install the chuck cone and machine tool spindle scrubbed clean, and then the body cone is installed on the main shaft, with a rubber hammer or mallet putter body surface, in order to ensure tight, firm or the connecting rod tension.
2 according to the corresponding sleeve clean processing needs, in the main hole, a main body slide the sleeve cap, the Quartet into the inner square hole in the main body, and then the corresponding tool clamping sleeve is provided in the end clamp, can be processed using.
3 as with a tapping, remember to put the nut is loosened, processing according to need to tap different torque, tighten the nut (screw cap is not easy too tight), the tap can not slide.
4 taps into the tap socket, should pay attention to the shank Quartet into the collet square holes, to increase the torque.
5 push the slip cap, can you remove the sleeve (or replacement), after use, cleaning rust-proof, subject, collet